IGS Deck Water Seal & Non Return Valve

2022-01-01

Deck Seal Inspection

  • Is the Deck Seal being inspected / maintained periodically as per PMS system?
  • Have high and low level alarms been tested before inert gas operation? Is there evidence of such tests?
  • Is the Deck Seal free of corrosion, both internally & externally?
  • Are the drain and supply valves in good working condition?
  • Are the strainers in good condition and cleaned?
  • Is the heating coil (if applicable) free of corrosion?
  • Is the sight glass cleaned and free of cracks?
  • Is the water level clearly visible?
  • Is the water at the normal level?
  • Is the normal water level marked?
  • Is the date of last inspection marked?

Non Return Valve Inspection / Overhauling

  • Is the NRV being inspected / overhauled periodically as per PMS system?
  • It the NRV operative & movable?
  • Is the NRV free of corrosion?
  • Is the valve's seat in good condition?
  • Is the date of last inspection marked?

Common Poor Practices

  • Deck Seal level was not normal.
  • Deck Seal was not marked with the minimum level.
  • Deck Seal was leaking from the sight glass.
  • Deck Seal was sighted with soft patches.

References

IMO, Fire Safety Systems Code (FSS)

OCIMF, ICS & IAPH, International Safety Guide for Tankers and Terminals (ISGOTT)

OCIMF, SIRE 2.0

Capt. Ioannis Papamarkou, MBA
Marine / Vetting / HSQE Superintendent 