Cargo Oil Operation Procedures & Documents
2019-10-29
Ensure that all officers are familiar with...
- Company policy procedures with regard to cargo operation.
- Emergency procedures.
- Cargo remote control & pielines system.
- Venting capacities including any installed primary & secondary means.
- Maximum permissible loading rates for each cargo & ballast tanks.
- Maximum cargo pumps capacity.
- Cargo / COW / Vapour / Inert gas / Ballast lines test requirements.
- COW operation.
- Flamability diagram.
- Designated emergency ballast cargo tank.
- Static electricity hazards.
- H2S hazards.
- Portable gas detector instruments use & calibration methods.
- Fixed gas detection system use, calibration method & gas alarm settings.
Ensure that following information are posted in CCR...
- Emergency procedures.
- Maxible loading rates and venting capacities.Pipelines / mimic diagrams of cargo, ballast, venting, and inert gas systems. They should be posted in Pump Room too.
- Cargo / Ballast pumps performance curves.
- Emergency ballast procedures.
- H2S hazards.
- Static electricity hazards.
Ensure that following documents are available during cargo operation...
- Ship / Shore Safety check list.
- Loading or Discharging plan.
- COW check list. It should be completed before, during and after COW operation.
- Line-up check list. It should be completed before, during and after cargo operation.
- Prior loading or discharging operation check list.
- CCR log book.
- Inert Gas check list
- Inert Gas log.
- Emergency contacts.
- Cargo MSDS.
- UKC calculation & tide tables.
- Cargo & Vaccum pumps temperature log.
- Rate calculation.
- Relevant Risk Assessments.
- STS check lists if applicable.
References
OCIMF, SIRE 2.0
